Power Station Piping


Design, Supply, fabrication, Erection, Testing & Commissioning of Station Piping Package Comprising of water, air, oil, steam and related power plant piping services and miscellaneous tanks AND Large Diameter CW Piping.


Sl. No.
Client
Project Job Description
1. Bajaj Infra Development Corporation Ltd. 3x660 MW Super Thermal Power Project at Lalitpur (UP) CW Piping Package on turnkey basis including CW Pumps, Electricals, Instrumentation and Civil works.
2. Reliance Energy Limited, Mumbai./Rosa Power Company Ltd. 2x300 MW Unit 3&4 ROSA THERMAL POWER PROJECT, Shahjahanpur, UP. Supply, Eraection, Testing & Commissioning of CW/ LP Piping and Misc Tanks Package including Equipment Erection
3. Adani Power Ltd., Ahemedabad 5x660 MW Tiroda Thermal Power Project CW, FOH & LP PIPING System for Tiroda Thermal Power Project
4. National Thermal Power Corp.Ltd., Noida (U.P) 2x500 MW Rihand Super Thermal Power Project LP PIPING System for Rihand Super Thermal Power Project (2x500 MW)
5. National Thermal Power Corp.Ltd., Noida (U.P) 4x250 MW Nabibagar Thermal Power Project Station Piping & Fuel Handling System for Nabibagar Thermal Power Project (4x250 MW)
6. Reliance Energy Limited/BHEL/HPGCL 2400 MW Samalkot CCPP, Andra Pradesh CW & L P Piping for 2400 MW Samalkot CCPP, Andra Pradesh
7. Lanco Infratech Ltd., Gurgaon 3x660 MW Koradi TPS, at Koradi, L P Piping & FOHS for 3x660 MW Koradi TPS, at Koradi, Nagpur, Maharashtra
8. L&T Limited, Faridabad 2x700 MW Rajpura TPP, at Rajpura, CW / LP Piping System for 2x700 MW Rajpura TPP, at Rajpura, Punjab
9. National Thermal Power Corp., Noida, (U.P) Sipat Super Thermal Power Project, Stage-II 2x500 MW Design, Supply, Fabrication, Erection, Testing & Commissioning of Station Piping Package on turnkey basis.
10. Reliance Energy Limited, Mumbai/Damodar Valley Corp., Kolkata 2X600 MW Raghunathpur TPP Supply, Erection, Testing & Commissioning of CW/ LP Piping and Misc Tanks Package including Equipment Erection.
11. Reliance Energy Limited, Mumbai/Haryana Power Gen. Corp. Ltd. 2x600 MW Hisar TPP Supply, Erection, Testing & Commissioning of CW/ LP Piping and Misc Tanks Package including Equipment Erection.
12. Reliance Energy Limited, Mumbai/UP Rajya Vidyut Utapadan Nigam Ltd. 2x250 MW Unit 5&6 Paricha Thermal Power Project, Supply, Erection, Testing & Commissioning of CW/ LP Piping and Misc Tanks Package including Equipment Erection.
13. Reliance Energy Limited, Mumbai/Rosa Power Company Ltd. 2x300 MW Unit 1&2 Rosa Thermal Power Project, Shahjahanpur, UP Supply, Erection, Testing & Commissioning of CW/ LP Piping and Misc Tanks Package including Equipment Erection.
14. Reliance Energy Limited/BHEL/HPGCL Tau Devi Lal Thermal Power Project, Unit 7&8 (2x210MW) Panipat Design, Supply, Erection, Testing & Commissioning of LP Piping System.
15. Bharat Heavy Electricals Ltd., Kolkata / DVC Mejia Thermal Power Project, 210 MW, Unit-4 Erection, Testing and Commissioning of LP & LD Piping System.
16. Bharat Heavy Electricals Ltd., Kolkata / WBPDCL Santaldih Thermal Power Project, 250 MW Erection, Testing and Commissioning of LP & LD Piping System.
17. Maharashtra State Electricity Board, Mumbai Khaperkkheda TPS Unit III & IV (2X210MW) Design, Engineering, Supply, Erection, Testing & Commissioning of the Low Pressure Piping Works.
18. Bharat Heavy Electricals Ltd., Kolkata/WBPDCL Bakreswar TPS (3x210MW) West Bengal Design, Engineering, Supply, Fabrication & Erection, Testing, Commissioning of Large Dia L.P. Piping System at Bakreswar (3 x 210 MW) TPP.
19. Haryana Power Generation Corp., Panchkula Panipat Thermal Power Station, Panchkula Design, Supply, Fabrication, Erection, Testing, Commissioning of Low Pressure Piping of Panipat Thermal Power Station 1 x 210 MW, Unit-6 (Stage-IV).
20. Maharashtra State Electricity Board, Mumbai 2 x 500 MW Chandarpur TPS Supply, Fabrication, Erection, Testing and Commissioning of 64 kms Ash and Sludge Disposal Pipelines on turnkey basis.
21. National Thermal Power Corp. Ltd., Noida (U.P) Feroz Gandhi Unchahar TPP, Stage-II (2x210MW) Design, Supply, Fabrication, Erection, Testing & Commissioning of L.P. Piping Package for Feroz Gandhi Unchahar TPP, Stage-II (2x210MW).
22. National Thermal Power Corp. Ltd., New Delhi 2 x 500 MW (Stage I) Talcher Super Thermal Power Project Design, Engineering, Manufacture Supply, Erection, Testing and Commissioning of Low Pressure Piping Package.

DOWNLOAD

CONTACT US

Raunaq International Ltd. (Formerly known as Raunaq EPC International Limited.)
20 km Mathura Road,
P.O. Box- 353, P.O. Amar Nagar
Faridabad-121003
Phone: +91-129-4288888
Fax: +91-129-4288823
Email: info@raunaqintl.com