| SL.No. |
Client/Consultant |
Project |
Job Description |
Year
of Completion |
Value
(Rupees in lacs) |
| 1. |
Mumbai Port Trust /Afcon Infrastructure Ltd)/Mumbai./ Kvaerner
E&C Singapore Pte |
Modernisation of MOT Berth J1,J2 & J3 at Jawahar Dweep
Mumbai Port Trust, Mumbai. |
Design Engineering, Supply, Erection, Testing
and commissioning of Products and Utility Piping system for
Modernisation of MOT Berth J1,J2 & J3 at Jawahar Dweep
Mumbai Port Trust, Mumbai.
|
2004 |
2890 |
| 2. |
National Thermal Power Corporation Ltd., Noida, |
Sipat Super Thermal Power Project Stage –II (2x500
MW) |
Design, Supply, fabrication, Erection,
Testing & Commissioning of Fuel Oil Unloading/Storage
and Handling System AND Station Piping Package on Turnkey basis. |
In Progress |
2860 |
| 3. |
Maharashtra State Electricity Board, Mumbai |
New Parli Thermal Power Project 1x250MW Stage-I |
Design, Supply,Fabrication, Erection,Testing & Commissioning
of Fuel Oil Unloading Storage & handling System on Turnkey
basis alongwith releated Civil, mechanical, Electrical &Instrumentation
Works. |
In Progress |
700 |
| 4. |
Reliance Energy Limited/BHEL, NOIDA |
Tau Devi Lal Thermal Power Project, Unit 7&8, 2x210MW
Panipat |
Design, Supply, Erection, Testing & Commissioning
of LP Piping System for Units 7&8 (2x210MW) |
2005 |
700 |
| 5. |
Bharat Heavy Electricals Ltd . Kolkata / DVC |
Mejia Thermal Power Project, 210 MW, Unit-4 |
Erection, Testing and Commssioning of LP & LD
Piping System |
2004 |
250 |
| 6. |
National Thermal Power Corporation Ltd., Noida |
Vindyachal Super TPP Stage I & II |
Ash Water Recirculation System Package on
EPC basis Comprising of Pumping/Piping & related Civil,
Mechanical & Instrumentation works. |
2002 |
1150 |
| 7. |
Rajasthan State Electricity Board Jaipur/development Consultants |
2x250 MW Suratgarh power Project |
Fuel Oil Handling & Storage
System Installation including Civil, Mechanical, Electrical,
and instrumentation works on turnkey basis |
1998 |
1096 |
| 8. |
Rolls Royce Industrial Power (India) Ltd., Hyderabad, Andhra
Pradesh |
Godavari Gas Power Project 208 MW |
Design, Engineering, Supply, Fabrication, Erection, Testing
and Commissioning of 16 KMS API 5L Gr. B Make-up Water
Pipeline including related approach Roadworks, Civil works &
Anticorrosive treatment in addition to temporary & permanent
Cathodic Protection
|
1996 |
1021 |
| 9. |
Maharashtra State Electricity Board, Mumbai |
Khaperkheda Thermal Power Station unit-3&4 |
Design, Engg., Supply, Erection, Testing & Commissioning
of Large Diameter Piping and Steel Tanks with all accessories
and associated works at Khaperkheda Thermal Power Station Unit
3&4 (2x210 MW) |
2000 |
1042 |
| 10. |
Afcons Infrastructure Ltd., Mumbai / Engineers India Ltd. |
Nagapattnam Refinery of IPCL |
Construction of 20" NB Cross-Country
Crude Oil Pipeline on EPC basis |
2003 |
688 |
| 11. |
Bharat Heavy Electrical Limited, CALCUTTA / WBPDCL |
Bakreswar TPP (3x210MW) West Bengal |
Design, Engineering, Supply, Fabrication, Erection, Testing
and Commissioning of Large Dia L.P. Piping System at Bakreshwar
'(3x210 MW) TPP. |
2000 |
1089 |
| 12. |
Haryana Power Generation corporation, Panchkula |
Panipat Thermal Power Station |
Design, Engineering, Supply, Fabrication, Erection, Testing
and Commissioning of Low Pressure Raw Water, Make up Water and
service water Piping, Construction of bridge and allied civil
work including erection of pumps and valvas for Panipat Thermal
Power Station 1 x 210 MW, Unit-6 (Stage-1V) |
2001 |
398 |
| 13. |
Hindustan Petroleum Corporation Ltd, Mumbai |
HPCL, Vizag refinery Project |
Mechanical works including erection of equipment and machinery,
fabrication and erection of hydrocarbon piping works for additional
tankage project Phase-11 for HPCL, at Vizag Refinery
|
2000 |
347 |
| 14. |
Balmer Lawrie & Co. Ltd., Kolkata / IOCL |
IOCL Retail Outlets |
Design, Supply, Installation, testing &
commissioning of Mechanical works & all related Civil, Structural
Architectural & Electrical works for construction of retail
outlets |
2002 |
672 |
| 15. |
National Thermal Power Corp. Ltd., Noida, (U.P.) |
Kayamkulam C.C.P.P (1x400MW) |
Design, Engineering, Supply, Fabrication, Erection, Testing
and Commissioning of Make-up Water piping System at Kayamkulam
408MW Combined Cycle Power Project |
1999 |
748 |
| 16. |
Maharashtra State Electricity Board Mumbai |
Khaperkheda thermal Power Stations Units-3&4/ |
Design, Engineering, Supply, Manufacturing, receipt handling
and storage at site erection , testing & commissioning of
the Low Pressure Piping works at Khaperkheda Thermal Power Station
Unit-3&4 (2x210MW) |
2001 |
185 |
| 17. |
Gas Authority of India Ltd, New Delhi/Engineers India ltd. |
UP Petro- Chemical Complex Auraiya |
Erection, Testing And Commission of Various Under-ground
piping System at Petrochemical complex of GAIL at PATA,
Auraiya |
1997 |
673 |
| 18. |
Indian oil Corporation Ltd. Delhi |
MDAJ Pipeline Hookup at Karnal |
Station Piping, Equipment Civil, Mechanical, Electrical &
Instrumentation works for Line Balancing tanks &
MDAJ Pipeline Hookup
|
1995 |
251 |
| 19. |
National Thermal Power Corp. Ltd., Noida (U.P) |
Feroz Gandhi Unchahar TPP, Stage-11 (2x210 MW) |
Design, Supply, Fabrication, Erection Testing & Commissioning
of L.P. Piping Package for Feroz Gandhi Unchahar TPP, Stage-11
(2x210MW) |
2000 |
750 |
| 20. |
Maharashtra State Electricity Board, Mumbai |
2x500 MW Chandpur TPS |
Supply, Fabrication, Erection Testing & Commissioning
of 64 KMs Ash and sludge disposal pipelines on turnkey basis.
|
1995 |
1500 |
| 21. |
Gas Authority of India Limited New Delhi / Engineers India
Limited |
U.P. Petro-Chemical Complex, Pata |
Erection Testing & Commissioning of 9 Kms cross country
Effluent Disposal pipeline with Cathodic Protection System
|
1997 |
273 |
| 22. |
Rajasthan State mines and Minerals Ltd.- Udaipur / Engineers
India Limited |
Jhamarkotra Integrated Project |
Erection of piping as well as erection of equipments &
machineries, electrical and related works |
1991 |
105 |
| 23. |
Indian Petrochemicals Corporation Ltd, Baroda/Engineers India
Ltd. |
Gandhar Petro-Chemical Complex, Dahej |
Erection, Testing and commissioning of UG/AG piping system |
1996 |
151 |
| 24. |
Orissa Power Generation Corporation Limited, Bhubaneshwar/
DESEIN |
2x210 MW IB TPS |
Design, Supply, Fabrication, Erection, Testing & Commissioning
L.P. Piping Package including Fuel oil Piping, Piperack etc. |
1995 |
525 |
| 25. |
National Thermal power Corp. Ltd., New Delhi |
2x500 MW (stage1) Techer Super Thermal Power Project |
Design, Engineering, Manufacture Supply, Erection, Testing
& Commissioning of Low Pressure Piping Package including
10 Kms, 800 mm dia cross country raw water pipeline
|
1995 |
650 |
| 26. |
Gujarat Alkalies & Chemicals Limited, Baroda/Fichtner
Consultants |
90MW Combined Cycle Captive power Project at Dahej
|
Erection Testing & Commissioning of mechanical package
consisting of piping and equipment erection works |
1998 |
107 |
| 27. |
Apollo Tyres Limited, New Delhi/M N Dastur & Co. Consultants |
Tyre Mfg. unit at Limda near Baroda, Gujarat |
Design, Engineering, Supply, Fabrication, Erection Testing
& Commissioning of entire pipe-works, valves & specialties.
|
1990 |
410 |
| 28. |
National Thermal Power Corp. Ltd. |
4x210 MW Dadri NCTPP |
Turnkey CW System Equipment & Piping Package including
Vertical Turbine Pumping sets |
1994 |
520 |
| 29. |
Maruti Udyog Limited, Gurgaon, Haryana/TATA Consulting Engineers
|
800cc Car Expansion Project |
Turnkey Utility Piping System Comprising of Services such
as Steam, LPG, NG, Water, Air, Oil, effluents etc. |
1994 |
410 |
| 30. |
Hindustan Motor Ltd, Chennai |
Lancer car project at Thiruvallur Tamilnadu |
Design, Engineering, Supply, Erection, Testing and Commissioning
of Utility Piping System. |
1998 |
115 |
| 31. |
Bharat Heavy Electricals Ltd., New delhi |
3x35 MW W.H.R Project at IP Gas Turbine Station, DESU, New
Delhi |
Large dia CW piping and LP Piping System |
1996 |
325 |
| 32. |
Tamilnadu Electricity Board, Madras |
4x210 MW Mettur Thermal Power Plant |
Large Diameter CW Piping System along with associated valves,
fitting, specialties and related civil works including gunniting
|
1990 |
187 |
| 33. |
Maruti Udyog Limited, Gurgaon, Haryana/TATA Consulting Engineers
|
1000 cc 3 box car project |
Supply, Fabrication, Erection, Testing & Commissioning
of Utility Piping System |
1990 |
60 |
| 34. |
Gujarat Perstorp Electroniks Limited, Gandhinagar |
Copper Clad Laminates Project |
Supply, Fabrication, Erection of utility Piping Package |
1993 |
78 |
| 35. |
Rolls Royce Industrial Power (India) Ltd., Hyderabad Andhra
Pradesh |
Godavari Gas Power Project |
Supply, Fabrication, Erection, Testing & Commissioning
of Fire Protection System Pipework, associated valves &
specialties like Fire Hydrants etc, Civil Works and corrosion
protection for buried pipeline and related works.
|
1997 |
45 |
| 36. |
Maruti Udyog Limited, Gurgaon, Haryana/TATA Consulting Engineers
|
New Weldshop for Expansion Project |
Turnkey Utility Systems |
1993 |
79 |
| 37. |
State Organisation for Tech Industries, Baghdad |
SAAD-3 Bullet factory |
Fabrication, Erection, Testing & Commissioning of Technological
Piping |
1983 |
70 |
| 38. |
State Organisation for Oil Projects Bagdad Iraq |
Mushsheda Oil Depot Project |
Detailed Engineering , Fabrication, Erection, Testing &
Commissioning of Oil Piping for pumping Station, Storage Tanks,
Loading arms, metering station & fire hydrant system
|
1983 |
80 |
| 39. |
Hetadua Cement Ind. Limited, Nepal |
Cement Plant |
Design, Manufacture, Supply & Installation of all machinery
equipment & piping, valves & accessories of Plant Utility
Services including fuel oil storage and unloading system.
|
1988 |
78 |
| 40. |
National Electricity Board of the State of Malaya, Malaysia/Snowy
mountains Engg. Corp. Australia |
4x100 MW. Kenyir Hydro Power Station |
Design, Supply, Manufacture Fabrication, Erection, Testing
& Commissioning of various Utilities for Power Project |
1986 |
120 |
| 41. |
Hindustan Motor Limited, Chennai |
Lancer Car Project at Thiruvallur Tamilnadu |
Design, Engineering, Erection, Testing & Commissioning
of Fire Protection System |
1998 |
105 |
| 42. |
Gujarat Industries Power Company Limited |
Surat Lignite Power Project |
Design, Supply,Manufacture,Fabrication, Erection, Testing
& Commissioning of LP Piping for 2x125 MW Surat Lignite
Power Project Unit-1&11 |
1999 |
298 |
| 43. |
Rolls Royce Industrial Power (India) Ltd., Hyaderabad, Andhra
Pradesh |
Godavari Gas Power Project 208 MW |
Design, Engineering, Supply, Fabrication, Erection, Testing
and Commissioning of Low Pressure Piping package |
1998 |
230 |
| 44. |
Maruti Udyog Limited, Gurgaon, Haryana/TATA Consulting Engineers |
Utility Piping System for Expansion project |
Design, Engineering, Supply, Fabrication, Erection, Testing
and Commissioning of Air, Water, Oil, LPG & Steam Piping
System |
1995 |
135 |
| 45. |
Balmer Lawrie & Co. Ltd., Calcutta |
Bitumen emulsion Plant of IOCL Panipat Refinery
|
Piping, Civil, Mechanical, Electrical & Instrumentation
work for Bitumen emulsion Plant of IOCL at Panipat Refinery |
2000 |
90 |
| 46. |
Haryana Power Generation corporation Panchkula |
Panipat Thermal Power Station |
Design, Engineering, Supply, Fabrication, Erection, Testing
and Commissioning of Low Pressure Raw Water, Make up Water and
service water Piping, Construction of bridge and allied civil
work including erection of pumps and valvas for Panipat Thermal
Power Station 1 x 210 MW, Unit-6 (Stage-1V) |
2001 |
398 |
| 47. |
Maruti Udyog Ltd. Gurgaon |
Utility Piping System Project |
Utility Piping work for Replacement Paint Shop Phase-2 (RPS
P-2) & Fire Hydrant System at Spare Part Division Building.
|
2001 |
96 |